New: Bed preparation machine - maxclean 3:1
Exhibitor
MAX-truder GmbH
In a market environment characterised by rising energy and labour costs, increasing competitive pressure and growing modernisation demands, operational efficiency determines the profitability of a precast concrete plant.
The maxclean 3:1 has been developed precisely for these requirements. It combines cleaning, release agent application and prestressing wire handling in one integrated system – with the aim of streamlining processes, conserving resources and minimising downtime. The result: measurably lower operating costs combined with higher process reliability.
Every minute counts in daily production. Separate work steps lead to unnecessary machine movements, increased labour requirements and additional wear.
The maxclean 3:1 integrates:
Mechanical cleaning of the casting bed surface and rails
Simultaneous pulling of multiple prestressing wires
Uniform, controlled release agent application
The new generation of machines has been consistently designed to meet the demands of daily operation. Ergonomics, visibility and intuitive operation are at the core.
Modern, functional design
Ergonomically designed operator workstation
Adjustable seat for different body sizes
Seat belt and head protection for increased safety
One-hand operation via joystick
Clear view in the direction of travel for maximum control
The result: greater safety, improved control and noticeable relief in daily operation.
