bauma CONEXPO INDIA 2023Products & Services Wirth PBA 818
Wirth PBA 818
Our Wirth PBA 818 pile top drill rigs provide solid foundations for bridges or bridge extensions. Five PBAs 818 have been drilling at the Mumbai Trans Harbour Link project, drilling piles with 2.2 m diameter and depths of up to 50 m.
The Mumbai Trans Harbour Link is a 22 km long bridge connecting the city of Mumbai with Navi Mumbai, its satellite city.
Further reading The Mumbai Trans Harbour Link is a 22 km long bridge connecting the city of Mumbai with Navi Mumbai, its satellite city.
Wirth PBA 818 in operation at Mumbai Trans Harbour Link project